It took a little over 8 yards of concrete to fill the forms. One truck was drained and a second came with the remaining material to finish the pour. It took less than an hour to fill the forms. Once the forms were filled, Zach, Chris and Alan began tapping the concrete down into the forms and leveling off the tops.
The last item was placing the lag bolts in the concrete for the cill plates. Once they were finished, I think the team was on their way to nap!