At long last, The sun has come out to shine. It has helped with the mud. However, even Alan was getting sick of the mud so he brought more gravel in this week.
Moving forward, things are going to be calming down a bit. Last week there were 9 subcontrators on the site at once. It was a bit hectic but, a lot was accomplished. The entire place has been insulated. The sheet rocking is almost complete, the pool platform was worked on, the roof is almost completed and more rock and earth was moved